Monday, February 25, 2013

Engine Art & Function (Partially)

Well as you know I've been focusing a lot of attention on turning this beautiful engine art into a working motor. With the stand, the clutch adapter plate, and engine wiring complete it should just be a matter of breaking in the motor a little. So I had hoped too.

It did run, just not as good as I wanted. First there were a series of CEL (Check Engine Light) codes to deal with. This meant isolating the cause for the codes and taking appropriate steps; sometimes requiring sensor replacement.


So here's the motor running once I reached the No CELs stage. If you listen carefully you will hear valve noise off and on. This still existed after I pulled the covers off and reset the valve clearances a second time. It started becoming apparent that something else was amiss. Keep in mind this is a used motor that someone did a partial rebuild/service to.

As I continued to test the motor under running conditions it continued to sound worse. I then decided it was necessary to tear it down again and dig into the details.

Right head after cleaning/lapping
Once I pulled the heads and started inspecting the valve assembly it started to get clearer:
  • All exhaust valve seals were loose - these were OK when inspected years ago. They'll get all new seals.
  • Most intake seals were dry-cracked - probably because the motor sat for several years before getting to this point. These seals will get replaced also.
  • Valve seats needed cleaned up - especially the exhaust. All valves/seats will be lapped.
  • Spark plugs were partially soaked - from blow-by of the exhaust seals. Two cylinders were worse than the others so those injectors will get tested. All were professionally cleaned before being installed.
Also inspected the pistons/cylinders in the block. There appears to be an excessive amount of oil in each cylinder. Even though some of it is due to loose exhaust valve seals, I don't think that can account for all of it. The pistons will get pulled and checked for stuck oil rings.

So I'd have to say at this point that I have partial function. I'll post back when it's all back together and hopefully have reached full function.

Wednesday, November 28, 2012

Engine Cradle - Final

The cradle is complete, the engine wiring is in place, and the switches and gauges are hooked up. I decided to use the instrument panel directly from a SHO to simplify dealing with gauges. I'll work out the final gauges once the test install of the engine is completed.


The bench test start-up is scheduled for next weekend. If everything works, I'll post some video.


Sunday, April 15, 2012

Engine Cradle - Phase 3

It took a while to get the adapter plate and clutch assembly for the SHO 3.2 to the 914. Once that was installed I could finalize the engine cradle.
First I had to test-fit the supports with the engine. The cradle had to be placed on cinder blocks to give me enough clearance to get the engine lift under the cradle. Back and forth a couple of times to adjust and locate the vertical supports was all that was needed.



Now its back on the ground and assembly of the engine components can continue. Basically anything needed to run the engine has to be added so I can test all components and wiring before attempting to install in the 914.
 

Sunday, January 8, 2012

Engine Cradle - Phase 2

Been working more on the engine cradle while waiting on parts for my son's 914. Have the horizontal and vertical supports now done for the SHO motor. It's actually starting to look like an engine stand.


The mating brackets for the engine are going to be plasma cut by a shop in Tucson. The intricacy of the design and steel thickness was beyond my hand tools. Once their done, I'll get them test fit and attached. Then I can move on to the 914 engine supports.

Tuesday, December 27, 2011

Engine Cradle - Phase 1

Spent the weekend & Monday working on my son's 914. Pulling the engine to reseal everything.

I said I'd never pull another 914 engine without the use of a lift. Never say never. It went pretty well - except that he needs seals bad so everything is an oily mess.

It occurred to me that since I was building an engine cradle for the SHO project, it wouldn't be much effort to build supports that would work with the 914 engine & transaxle. I could have them done before the engine is ready to go back in.

Did manage to get some time in on the engine cradle - one of the side benefits of my son's infatuation with games.

Spent the morning cutting, beveling, and cleaning pieces for the base, and the caster extensions.

Got the base welded together and ran out of welding wire just as my son showed up.

It was a beautiful crisp morning - and by noon it felt like 70 degrees. This is why I love southern Arizona.


Time to shift gears and guide him in the rest of his engine tear-down.

More to follow . . .

Saturday, December 24, 2011

Back on the 914

Well after a couple of years working on other cars (for my sons), I'm back into the saddle on my 914 project. I was doing plenty of planning/designing during that time also so the project wasn't completely idle.
Here's the engine cradle design. It's a variation on the cradle design I bought on line from Russ Green.

Since this is going to serve multiple purposes, I needed to modify a few things:
  1. I need to mount engine & tranny together with flywheel & clutch
  2. Use the cradle to bench-test the engine, harness, & components
  3. Use the cradle to install the engine & tranny
To support the 914's transaxle I added support plates that will mount behind the bell-housing fasteners. The lower one acts as a cross-member, while the upper just tie to the support posts.


Not shown are the two additional cross members I added so that I can lift the whole assembly with my ATV lift. This will make installation much easier and safer.

I've also designed the engine bar that supports the engine in the car. It will mount in the stock position, but sitting on top of the receiver plate rather than hanging down. It looks like I can use the stock transaxle mounts, but I may need to add a small adapter plate once I do the test fit.

Now that I have the material together I can begin fabrication and assembly. Ahhh - the fun begins.

Wednesday, September 7, 2011

Tha Cave - Under Construction - 2

Well I reached a stage of completeness - the framework and fixed shelves are up, painted, and ready for the facing and doors. I was so thrilled to finally have all this stuff off the floor and room for two cars in the garage again.

Just in time to get pulled off for a couple of weeks to tackle another project. I'll be back.