The cradle is complete, the engine wiring is in place, and the switches and gauges are hooked up. I decided to use the instrument panel directly from a SHO to simplify dealing with gauges. I'll work out the final gauges once the test install of the engine is completed.The bench test start-up is scheduled for next weekend. If everything works, I'll post some video.