I said I'd never pull another 914 engine without the use of a lift. Never say never. It went pretty well - except that he needs seals bad so everything is an oily mess.
It occurred to me that since I was building an engine cradle for the SHO project, it wouldn't be much effort to build supports that would work with the 914 engine & transaxle. I could have them done before the engine is ready to go back in.
Spent the morning cutting, beveling, and cleaning pieces for the base, and the caster extensions.
Got the base welded together and ran out of welding wire just as my son showed up.
It was a beautiful crisp morning - and by noon it felt like 70 degrees. This is why I love southern Arizona.
Time to shift gears and guide him in the rest of his engine tear-down.
More to follow . . .

